023 9247 1029

This project was recently completed in July 2018 for Spectrum Workspace Ltd. www.spectrumworkplace.co.uk

The 2400 sq.m flooring package was carried out over a phased 6 month program.

The various floor coverings laid over the two floors were Desso Grain, Interface Flannel Tweed, Interface Collins Cottage, Plus Floor LVT’s and Forbo Sphere Energetic.